Working Principle

This is so called three-zone type thermal shock test chamber.
Sample is placed in the test chamber, more extreme temperature than test temperature can be set in high-temperature chamber and low-temperature chamber. When it comes to low temperature test, cold chamber door open, and low-temperature chamber working together with test chamber.
When converted into high-temperature test, cold chamber door closed, hot chamber door are opened, and test chamber working together with high-temperature chamber.
Conversion of mechanical action (transferring from high temperature to low temperature or low temperature to high temperature) can be completed in less than 1second, and the temperature can be quickly stabilized.
During the whole test, test sample is no need to be moved, and without any human intervention.

 

Applications

3-zone Thermal shock chamber have been designed to operate in accordance with reliability programs, quality control, commercial test programs and medical tests. It is used to test the capability of material structure or composite material to withstand the continuous environmental changes between extremely high temperature and low temperature during a short period. It is applicable to metals, plastic, rubber, electronics amongst other materials. The test result can be used as a reference or basis for produce improvement.


Features

1.Thermal shork chamber in each zone for peak demand of heating and cooling. Provides extra thermal energy to efficiently meet the MIL-STD 883 requirements.
2.Temperature recorder provides 24 hour part temperature recording as the load travels from zone to zone. Using touch-control graph control as operation interface, easy to operate.
3.The system can be used for automatic Circulation Shock or manual selective shock, capable of setting two zones or three zones shocks as well as cold and thermal shock start-up.
4.Custom-made and optional accessories available.


Standards Implement and Met

GB/T 2443.1-2001 Test A: Low temp. Test;
GB/T 2443.2-2001 Test B: Low temp. Test;
GB/T 2443.22-2002 Test N: Low temp. Test;
GJB 150.3-1986 High Temp. Test;
GJB 150.4-1986 Low temp. Test;
GJB 150.5-1986 Temp. Impact Test;
(Load refer to 5.5.5 no active load)

 

KTS-A Series

Model KTS-A Series
72A 100A 150A 200A 252A 300A 480A
Inside   size(mm) W 450 500 600 670 700 800 800
H 400 450 500 600 600 600 800
D 400 450 500 500 600 650 750
Outside   size(mm) W 1490 1540 1640 1720 1750 1850 1850
H 1790 1840 1890 2000 2000 2000 2200
D 1600 1700 1830 1850 1930 1980 2500
Test   weight 5 10 12 15 18 20 20
Low Temp   Chamber -55ºC~-10ºC,   Pre cooling time: ≤ 60 min from +20ºCto-55ºC
Test   Chamber -40ºC~+150ºC
High   Temp Chamber +60ºC~+200ºC   ,Within 20 min, Pre-heating time
Transition   time ≤15S
Recovery   time High-Temp   Exposure 30 min to reach & stabilize required hot temp of test sample
Low-Temp   Exposure 30 min to reach & stabilize required cold temp of test sample
≤ 5 min
Ambient   Temp. +5ºC~+35ºC
Power AC   380±10% 50Hz ,3   phase 4 wires +Ground Wires

 

KTS-B Series

 

Model KTS-B Series
72B 100B 150B 200B 252B 300B 480B
Inside   size(mm) W 450 500 600 670 700 800 800
H 400 450 500 600 600 600 800

 

  D 400 450 500 500 600 650 750
Outside   size(mm) W 1490 1540 1640 1720 1750 1850 1850  
H 1790 1840 1890 2000 2000 2000 2200  
D 1600 1700 1830 1850 1930 1980 2500  
Test   weight(KG) 5 10 12 15 18 20 20  
Low   Temp. chamber -70ºC~-10ºC   ,Pre cooling time: +20ºC~-70ºC ,≤ 60 min  
Test.   Chamber -55ºC~+150ºC  
High   Temp. chamber temperature +60ºC~+200ºC,Preheating   time: ≤20 min  
Transition   time ≤15S  
Recovery   time High-Temp   Exposure 30 min to reach & stabilize required hot temp of test sample  
Low-Temp   Exposure 30 min to reach & stabilize required cold temp of test sample  
≤ 5 min  
Ambient   Temp. +5ºC~+35ºC  
Power AC   380±10% 50Hz ,3   phase 4 wires +Ground Wires  

KTS-D Series

 

Model KTS-D   Series
72D 100D 150D 200D 252D 300D 480D
Inside   size(mm) W 450 500 600 670 700 800 800
H 400 450 500 600 600 600 800
D 400 450 500 500 600 650 750
Outside   size(mm) W 1490 1540 1640 1720 1750 1850 1850
H 1790 1840 1890 2000 2000 2000 2200
D 1600 1700 1830 1850 1930 1980 2500
Test   weight 5 10 12 15 18 20 20
Low Temp   Chamber -80ºC~-10ºC,   Pre cooling time: ≤ 60 min from +20ºCto-80ºC

 

Test   Chamber -65ºC~+150ºC
High   Temp Chamber +60ºC~+200ºC   ,Within 20 min, Pre-heating time
Transition   time ≤15S
Recovery   time High-Temp   Exposure 30 min to reach & stabilize required hot temp of test sample
Low-Temp   Exposure 30 min to reach & stabilize required cold temp of test sample
≤ 5 min
Ambient   Temp. +5ºC~+35ºC
Power AC   380±10% 50Hz ,3   phase 4 wires +Ground Wires

 

A 31-year specialist in advanced environmental test equipment

KOMEG Technology Industrial is famous for its KOMEG star brand of environmental test equipment in China since 1990. KOMEG has specialized in climatic test chambers, thermal shock test chambers, walk-in chambers,burn-in rooms, and ageing test chambers, drying ovens, salt spray testers, medical laboratory equipment, etc.KOMEG factory is located in Dongguan, covering an area of 5,000 sqm, with over 200 employees including 26 R&D engineers.KOMEG also has offices in Shenzhen and Songshan Lake National Hi-Tech Industrial Development Zone.

Born for quality, test for future

Born for quality, test for future is always our philosophy. Better idea, better design and better quality is our aim.KOMEG strives for continuous innovation, releasing no less than 5 new designs each year. Our strong R&D team and skilled workers are the keys to our success.No matter it is a standard or custom-made project, we have rich experience in handling such so that customers worldwide can benefit more from KOMEG when working with us. And to ensure your specific test standards are met, the key components and parts are using an imported famous brand. That's why SGS, KONICA MINOLTA, SENKO, Midea, TCL, and Huawei are among our long-term clients.

Send contact

You might also like...